k6 prints `WARN[0030] Insufficient VUs, reached 100 active VUs and cannot initialize more executor=constant-arrival-rate scenario=steady`.

AdvancedTroubleshootingk6 Load Testing
Answer

Likely causes → With an arrival-rate executor, each in-flight request needs a VU. If the system slows down, more VUs are needed (Little's Law: rate x latency). When maxVUs is reached, k6 cannot start iterations on schedule and the target rate is not achieved, which hides how bad the slowdown is.

Diagnose → Check dropped_iterations in the summary, and compute required VUs: rate x p99 latency (s). At 200 RPS and 2 s latency that is 400 VUs.

Fix → Raise maxVUs (and preAllocatedVUs to avoid allocation cost mid-test), or treat the warning as the test result: the system cannot sustain the rate within acceptable latency.

Prevent → Add a threshold on dropped_iterations (for example 'dropped_iterations': ['count<1']) so the test fails visibly.