Interview Prep/SRE & Reliability/Chaos Engineering & Game Days

Design a game day for an AZ failure on EKS.

AdvancedScenarioChaos Engineering & Game Days
Answer

Situation read → AZ loss tests capacity, topology spread, stateful failover, and team response.

What I'd do →

  1. Hypothesis: "With one AZ unavailable, checkout SLI stays above 99.5% and recovers fully within 10 minutes."
  2. Prepare: verify topology spread constraints, PDBs, N+1 AZ capacity, RDS Multi-AZ, and dashboards.
  3. Inject with AWS FIS: aws:network:disrupt-connectivity on subnets in one AZ, or stop instances tagged with that AZ; stop condition is the SLO burn CloudWatch alarm.
  4. Roles: IC, observers, scribe; announce to stakeholders.
  5. Observe: pod rescheduling, Pending pods, Karpenter or Cluster Autoscaler behaviour, DB failover time, SLI.
  6. Restore and write up findings with action items.

Why → AZ failures are realistic and expose capacity and dependency assumptions.

Interview tip → Include the stop condition and the capacity check.

All SRE & Reliability questions Roadmap: SRE & incident response

More on Chaos Engineering & Game Days