The incident is mitigated by a rollback. The developer wants to redeploy the fix in 20 minutes.

IntermediateScenarioRunning Incidents
Answer

Situation read → Rushing a fix right after an incident is a classic way to cause a second one.

What I'd do →

  1. Confirm the SLI is stable and the incident is resolved.
  2. Require the fix to go through the normal pipeline with tests that reproduce the bug.
  3. Deploy with a slower canary and close monitoring.
  4. Only if the rolled-back version has its own serious problem (security, data issue) should the fix be expedited, with extra review.

Why → After mitigation, urgency drops; normal safety processes should come back.

Interview tip → "Once mitigated, we're no longer in a hurry" is a good line.