The incident is mitigated by a rollback. The developer wants to redeploy the fix in 20 minutes.
IntermediateScenarioRunning Incidents
Answer
Situation read → Rushing a fix right after an incident is a classic way to cause a second one.
What I'd do →
- Confirm the SLI is stable and the incident is resolved.
- Require the fix to go through the normal pipeline with tests that reproduce the bug.
- Deploy with a slower canary and close monitoring.
- Only if the rolled-back version has its own serious problem (security, data issue) should the fix be expedited, with extra review.
Why → After mitigation, urgency drops; normal safety processes should come back.
Interview tip → "Once mitigated, we're no longer in a hurry" is a good line.
More on Running Incidents
You're paged at 2 AM: CheckoutErrorBudgetBurnFast. Walk through your first 10 minutes.BeginnerDuring an incident, three senior engineers are all debugging in different directions and nobody is updating stakeholders.IntermediateError rate spikes 5 minutes after a deploy, but the developer insists their change can't be the cause.BeginnerLatency doubled across all services at the same time, with no deploys. Where do you look?AdvancedA SEV-1 has been running for 3 hours. People are tired and making mistakes. What do you do as IC?IntermediateHalfway through an incident, you discover the "fix" someone applied made it worse.Beginner