How do you get product managers to agree to an SLO?
IntermediateConceptSLIs, SLOs & SLAs
Answer
Talk in their terms: show past incidents, what they cost (conversion, tickets, churn), and what each extra nine costs in engineering time and slower releases. Offer two or three concrete targets with the trade-off spelled out ("99.9% means we can absorb about 43 minutes of failure a month and keep shipping daily; 99.99% means 4 minutes, and we would need multi-region work first"). Make the error-budget policy a joint decision, signed by both engineering and product leads.
More on SLIs, SLOs & SLAs
Define SLI, SLO and SLA with an example of each.BeginnerWhy should the SLA be looser than the SLO?BeginnerWhy are SLIs best expressed as a ratio of good events to valid events?IntermediateWhat is the difference between request-based and time-based (window-based) SLIs?AdvancedWhere should you measure an SLI, and what are the trade-offs?AdvancedWhat types of SLIs exist beyond availability and latency?Intermediate