Black Friday traffic is expected to be 5x normal. How do you make sure the observability stack survives?
AdvancedScenarioLong-Term Storage, Scale and Cost
Answer
Situation read → More traffic means more logs, spans and possibly series; the monitoring system must not fail when you need it most.
What I'd do →
- Load test the pipeline at 5–7x:
avalanchefor metrics,k6or telemetrygen (telemetrygen traces --rate 5000) for OTel, synthetic logs for Loki. - Scale ahead: more Collector gateway replicas, ingesters, distributors; pre-warm Elasticsearch shards.
- Check limits: tenant ingestion rates, Loki
ingestion_rate_mb, Collectormemory_limiter. - Plan a degradation mode: lower trace sampling and drop DEBUG logs with one config change.
- Freeze observability config changes in the week before.
- Watch the monitoring system's own dashboards during the event.
Why → Observability load grows with traffic, and overload hides the incidents you are there to catch.
Interview tip → Mention priority: keep metrics and alerts flowing even if logs and traces must be reduced.
More on Long-Term Storage, Scale and Cost
Prometheus keeps 15 days of data, but leadership wants 13 months of metrics for capacity planning. What do you build?IntermediateThe Thanos compactor has halted and the bucket keeps growing. What do you do?AdvancedGrafana shows every series twice after you added a second Prometheus replica with Thanos. How do you fix it?IntermediateRemote write to your central store is falling further behind every hour. How do you handle it?AdvancedMimir rejects writes from a team with `err-mimir-max-series-per-user`. What do you do?IntermediateYour observability SaaS bill tripled in a quarter, driven by custom metrics. How do you bring it down?Intermediate