You need to upgrade ARC across 10 clusters with zero dropped jobs. Plan it.
AdvancedScenarioRunners, ARC, Monorepos & Releases
Answer
Situation read → Controller and scale sets must match versions; CRDs change.
What I'd do →
- Read release notes for CRD changes.
- In a staging cluster: uninstall scale sets (running jobs finish first since ephemeral runners drain), upgrade the controller with new CRDs, reinstall scale sets with the same names.
- Roll cluster by cluster during low traffic; with two clusters serving the same scale set name via different runner groups, shift load first.
- Validate with a canary workflow that targets each scale set.
Why → Version skew between controller and scale set is a common source of listener failures.
Interview tip → Mention pinning --version for both charts.
More on Runners, ARC, Monorepos & Releases
You must build on runners that can reach an internal Artifactory. Design the runner setup.AdvancedPersistent self-hosted runners keep failing because a previous job left files and Docker images. Fix the root cause.BeginnerDesign ARC for a company with Linux build jobs, Docker image builds, and GPU tests.AdvancedA monorepo has 30 services; every PR builds all of them. Redesign.AdvancedA monorepo deploys each service independently with its own version. How do you trigger and version releases?AdvancedDesign a release workflow for a CLI tool that publishes binaries for Linux, macOS and Windows.Intermediate